Engineering
Service for a Complete Hazardous Waste Treatment
Facility, Kualiti Alam Sdn Bhd, Malaysia, 1995-2000
For
Kualiti Alam, a Malaysian hazardous waste treatment company, Chemcontrol
has carried out conceptual and basic engineering. Based on these
documents Chemcontrol prepared tender documents for the plant. The plant
includes an incinerator for 28,000 t/year, physical/chemical treatment
5,000 t/year and a solidification plant 10,000 t/year. The plant will
further be provided with temporary storage facilities to relieve those
industrial plants where the waste has been accumulated for several years.
The plant also includes a secure landfill. After
assisting the local company during the tender evaluation, Chemcontrol has
worked as the local company’s technical adviser. The work included
fundamental waste survey, conceptual design, the Environmental Impact
Study (EIA), tender documents, the evaluation of the tenders, and finally
the supervision of the main contractor including evaluation of the
commissioning test of the plant. Chemcontrol also provided input when
negotiating the operational conditions given by the authorities. In
co-operation with Chemcontrol, Kommunekemi International Management a/s (KKIM)
has submitted key personnel for a period of two years in order to assist
Kualiti Alam in the day-to-day operation and handling of the incoming
waste. DANCED has also financed the training of some of the key staff at
Kualiti Alam especially transport crew, laboratory staff, sampling
personnel and plant operators. For
Kualiti Alam Chemcontrol elaborated a computer based manifest system,
tracking the waste from delivery until final disposal.
|