![]() |
|
| Basic Design of a Integrated Hazardous Waste Management Plant and Technical
Adviser to the Owner, Ailinco S.A, Argentina
In
Argentina Chemcontrol a/s has prepared the design basis for a fully
integrated Hazardous Waste treatment plant. The
plant is situated 100 km northvest of Buenes Aires and includes reception
facilities, laboratory, tank farm, physical chemical treatment, secure
landfill and an incinerator with a capacity of 10,000 tons/year. After
commisioning Chemcontrol has assisted the owner Ailinco during the initial
testing of the plant.
|