Basic Design of a Integrated Hazardous Waste Management Plant and Technical Adviser to the Owner, Ailinco S.A, Argentina

In Argentina Chemcontrol a/s has prepared the design basis for a fully integrated Hazardous Waste treatment plant.

The plant is situated 100 km northvest of Buenes Aires and includes reception facilities, laboratory, tank farm, physical chemical treatment, secure landfill and an incinerator with a capacity of 10,000 tons/year.  

After commisioning Chemcontrol has assisted the owner Ailinco during the initial testing of the plant.